
 |
 |

Otway Basin (Australia)
Gas Projects in Development

CalEnergy Gas participates in three permits in the Otway Basin surrounding the Thylacine and Geographe
Fields which are in construction. The three permits
– Vic/P43, T/30P and T/34P – are under an intensive evaluation phase,
including 3D seismic. The Aragorn 3D seismic survey and processing has
been completed in the T/30P and T/34P permit areas. Drilling is targeted for
2009 in T/34P. In T/30P, further evaluation of the Aragorn 3D data is required
to mature near field prospects. A data review continues in Vic/P43, with planning
for a 3D seismic survey to be carried out in 2008.
| Resource Development |
|
|
Gas Projects
in Commissioning |
Share of Reserves |
Size in Square Kilometers
(Net) |
Current Percentage
Working Interest |
 |
| Thylacine/Geographe |
45 PJ |
133 |
5% |
|
|
|
|
|
 |

 |


| | | | | |

©2008 CalEnergy Generation. All rights reserved.
|